Construction Update 7.4.2025
One of our ideas for the house is that it not collapse in a heap. These 24’ steel posts should help.
The front porch framing is done!
Our initial plan for the entry to T&E’s apartment was a double door. In the end, that wasn’t feasible. We think we have the solution.
Next week: continuing the framing of the addition, moving from the first to the second floor.







